Hawke's Bay · Regional hub

Business power in Hawke's Bay: what sets your price

Hawke's Bay, NZ business power: which lines company you're on (Unison, Centralines or Firstlight), how capacity and winter peak charges work, and 2026 changes.

Lines networkUnisonCentralinesFirstlight Network

Quick answer

Most Hawke's Bay businesses are on Unison's network. Unison charges commercial sites a daily fixed charge based on connection capacity. Bigger sites also pay for demand at weekday peak times, and winter peak demand costs nearly double the summer rate. Central Hawke's Bay is on Centralines, and Wairoa is on Firstlight Network.

Lines network

Unison · Centralines · Firstlight Network

Main business centres

Napier · Hastings · Havelock North · Waipukurau · Waipawa · Wairoa

Hawke's Bay: key facts

  • Unison's Hawke's Bay prices from 1 April 2026 charge demand-billed business sites $6.75 per kW per month for winter peak demand (May to September), compared with $3.50 in summer, plus a monthly demand charge of $3.75 per kW, up from $2.50.
  • The fixed daily charge for a 28–69 kVA commercial connection on Unison's Hawke's Bay network rose from $7.75 to $9.00 (excl. GST) on 1 April 2026.
  • The Hawke's Bay Power Consumers' Trust is paying $275 per eligible connection in 2026 to account holders on Unison's Hawke's Bay network connected by 30 September 2026. It is paid only to consumers who register with the trust.
  • Transpower's $47 million rebuild of its Redclyffe substation runs from October 2026 to December 2027. It lifts the site's flood protection to a 1-in-450-year standard after Cyclone Gabrielle.
  • In its 2026 financial year, Centralines returned $1.7 million to Central Hawke's Bay consumers through discounts.

Which lines company runs the network in Hawke's Bay?

Your lines company is set by your address, and the ICP number on your bill shows which one you're on. There are three in Hawke's Bay:

NetworkMain areasOwnerRegulation
UnisonNapier, Hastings, Havelock North and most of the regionHawke's Bay Power Consumers' TrustPrice-quality path set by the Commerce Commission
CentralinesCentral Hawke's Bay, including Waipukurau and WaipawaCentral Hawke's Bay Consumers Power TrustExempt, because it is consumer-owned
Firstlight NetworkWairoa districtPowerco (since 31 July 2026)Price-quality path set by the Commerce Commission

Unison also runs the networks in Rotorua and Taupō, but Hawke's Bay has its own price schedule. Unison manages Centralines under a services agreement, but Centralines keeps its own owners and prices. Unison's Rotorua and Taupō networks are covered on our Bay of Plenty and Waikato hubs; for the rest of the country, see our regional hubs.

How does Unison charge a business connection?

Unison sets lines charges for each connection based on its size and meter. All prices below exclude GST and include transmission.

  • Small general connections pay $2.10 a day. On time-of-use metering, the rates are 14.1c per kWh at peak times, 9.2c at shoulder times and 2.4c off-peak. Peak times are 7–11am and 5–9pm on weekdays.
  • Commercial connections from 28 kVA pay a daily fixed charge based on their capacity band. Every band's charge rose on 1 April 2026:
Commercial capacity bandDaily charge 2025/26From 1 April 2026
28–69 kVA$7.75$9.00
70–138 kVA$16.00$18.00
139–277 kVA$34.50$37.50
278–436 kVA$50.00$62.50
  • Demand-billed sites pay demand charges on their highest half-hour. Peak demand, measured 7–11am and 5–9pm on working days, costs $6.75 per kW per month in winter (1 May to 30 September) and $3.50 in summer. They also pay a monthly demand charge of $3.75 per kW (up from $2.50) on their highest half-hour in the month, at any time of day. So a site whose 200 kW monthly high falls in a winter peak window pays $2,100 that month in demand charges alone.

Two other 2026 changes help businesses: the power factor (kVAR) charge is now zero, and there is a new 4c per kWh credit for power a site exports to the network at peak times.

What else is changing for Hawke's Bay businesses?

Unison says its 2026 prices follow the Commerce Commission's new allowances. It has also joined Localflex, New Zealand's first local flexibility market, launched on 11 August 2026, which pays businesses with batteries, solar, EV chargers or adjustable load to ease pressure on the local network.

Gas costs are rising too. Hawke's Bay is on Powerco's gas network, and Powerco's gas distribution charges rise by an average of 13.4% from 1 October 2026. See our guide to gas supply and business gas and LPG.

What makes Hawke's Bay's supply different?

The grid is still being rebuilt after Cyclone Gabrielle. In February 2023, floodwater reached Transpower's Redclyffe and Whirinaki substations. Transpower calls it the greatest loss of power supply the region has ever had. In September 2025, a new transformer at Redclyffe lifted the region's import capacity from 130 MW to 250 MW. A $47 million rebuild of the 220 kV switchyard runs from October 2026 to December 2027 and is designed to withstand a 1-in-450-year flood.

More power is being generated locally. The Harapaki wind farm on the Maungaharuru Range, north of Te Pohue, can produce up to 176 MW. In Central Hawke's Bay, ground was broken in July 2026 on a solar farm at Ongaonga. It will have around 49,000 panels, is expected to be operational by autumn 2027, and should produce about 50 GWh a year straight into the Centralines network. In August 2026, Centralines said it had livened its upgraded Ruataniwha substation, whose new 33 kV switchroom will be the solar farm's connection point.

The economy leans more on primary industry than the country as a whole. In Stats NZ's figures for the year to March 2024, agriculture and primary manufacturing each made up about 7% of Hawke's Bay's industry output. Nationally, agriculture made up 3% and primary manufacturing 5%.

What should a Hawke's Bay business check?

  • Your capacity band. It sets your daily charge, and every band's charge went up in 2026. If your business has shrunk or changed, check that your connection's capacity still matches the power you actually use.
  • Your winter weekday peaks. On demand billing, moving heavy loads out of the 7–11am and 5–9pm windows between May and September can cut your charges.
  • Who the power account is in, and whether it's registered. The Hawke's Bay Power Consumers' Trust's $275 dividend for 2026 goes to the name on the account, but only once that account holder registers with the trust (by 5pm on 17 November 2026 to be in the first payment run). Leases should make clear whether that is the landlord or the tenant.
  • Your energy rate on each site. Your address fixes your lines company, but not your retailer. If you have sites on both Unison and Centralines, the lines charges will differ, so compare the energy rate on each. You can see what we do for business electricity, or talk to us about your Hawke's Bay sites.

Business energy in Hawke's Bay: questions

Which lines company supplies my business in Hawke's Bay?

It depends on where your business is. Napier, Hastings and most of the region are on Unison. Central Hawke's Bay, including Waipukurau and Waipawa, is on Centralines. Wairoa is on Firstlight Network, which Powerco has owned since 31 July 2026. Your power bill shows your ICP number, and that identifies your network.

Do businesses get the Hawke's Bay power trust dividend?

Under the trust's 2026 rules, it pays $275 per eligible connection to whoever is named on the power account for a property on Unison's Hawke's Bay network, if the property was connected on or before 30 September 2026, up to three payments per consumer. It isn't automatic: you register with the trust using the six-digit code it sends you, your ICP number and a bank account, and registrations by 5pm on 17 November 2026 are paid from 24 November. Check business eligibility with the trust.

Why are my lines charges higher in winter?

If your site is billed on demand, Unison charges $6.75 per kW per month for peak demand from 1 May to 30 September, compared with $3.50 from October to April. Peak demand is your highest half-hour on a working day, measured from 7–11am and 5–9pm. That means one busy half-hour on a cold morning can set the charge for the whole month. Demand-billed sites also pay a monthly demand charge of $3.75 per kW (up from $2.50) on their highest half-hour in the month, at any time of day.

Is Hawke's Bay's power supply more resilient since Cyclone Gabrielle?

It has improved, and more work is under way. In September 2025, Transpower added a transformer at Redclyffe. This nearly doubled how much power the grid can bring into the region, from 130 MW to 250 MW. A $47 million rebuild of the substation's 220 kV switchyard runs from October 2026 to December 2027, and Transpower expects no interruption to supply during the work.

Is natural gas getting more expensive in Hawke's Bay?

Hawke's Bay is on Powerco's gas distribution network. Powerco's gas distribution charges rise by an average of 13.4% from 1 October 2026. The effect on your bill will depend on how much gas you use and how your retailer passes the change on.

Sources

Primary sources first. Every figure on this page comes from one of these, each with the date we last accessed it.

  1. Unison Electricity Distribution Delivery Prices — Hawke's Bay pricing region, effective 1 April 2026 (opens in a new tab)Unison Networks · accessed 25 September 2026
  2. Unison Networks Limited (opens in a new tab)Unison Networks · accessed 24 September 2026
  3. Consumer owned electricity distribution businesses (opens in a new tab)Commerce Commission · accessed 24 September 2026
  4. Redclyffe substation rebuild (opens in a new tab)Transpower · accessed 24 September 2026
  5. Hawke's Bay and Tairāwhiti electricity supply given boost (opens in a new tab)Transpower · accessed 24 September 2026
  6. 2026 dividend information (opens in a new tab)Hawke's Bay Power Consumers' Trust · accessed 24 September 2026
  7. About Centralines (opens in a new tab)Centralines · accessed 24 September 2026
  8. Centralines reports solid year focused on reliability, resilience and community (opens in a new tab)Centralines · accessed 24 September 2026
  9. Blessing and groundbreaking mark major milestone for Central Hawke's Bay solar farm (opens in a new tab)Centralines · accessed 25 September 2026
  10. Ruataniwha Substation upgrade strengthens Central Hawke's Bay network and supports new solar farm connection (opens in a new tab)Centralines · accessed 25 September 2026
  11. No change for Firstlight Network customers with Powerco purchase (opens in a new tab)Powerco · accessed 24 September 2026
  12. New Zealand's first local flexibility market goes live (opens in a new tab)Powerco · accessed 24 September 2026
  13. Gas pricing (opens in a new tab)Powerco · accessed 24 September 2026
  14. HB wind farm, NZ's highest (opens in a new tab)BayBuzz · accessed 24 September 2026
  15. Regional gross domestic product: Year ended March 2025 (opens in a new tab)Stats NZ · accessed 24 September 2026

Last updated by the Manage My Bills Energy Team.

Insights

Latest insights from across New Zealand

Business in Hawke's Bay?

See what your connection could cost

Your lines network and price category are set by your connection, not your postcode. Enter your address or ICP and see what your Hawke's Bay site could pay, in about two minutes.

  • About two minutes
  • Address or ICP — no bill upload
  • Commercial connections, nationwide

Talk to a specialist

Prefer a call back?

Leave a name and a number

We ring back within one working day. Open Mon–Fri 8am–8pm.

Or call us now on 0508 692 455 · Privacy policy (opens in a new tab)